Municipality of Iqaluit, Nunavut Canada
Water Reclamation Facility. |
 |
Iqaluit, the capital of Nunavut. |
 |
Honeycombing was repaired and 5 1/2
inches of shotcrete was applied over top with reinforcing steel. |
 |
Full welded wire fabric with dowels
placed prior to installation of shotcrete. |
 |
Pressure wash all walls after 72
hours of shotcrete installation. |
 |
Clean
up after pressure washing. |
 |
Prepare for coating walls with Xypex Concentrate and Modified |
 |
Applying Xypex Concentrate at 1.5 lb. per square yard. |
 |
Let
cure before applying a second coat of Xypex Modified at 1.5 lb. per square yard. |
 |
Finally moisture cure for 3 days and 12 days air cure as per Xypex
Specifications + Application Manual. |
 |
Fill
tank with water. |